Forging:
- Steel
- Stainless Steel
- Other Alloy
Casting:
Material:
-
Alloy
- Aluminum
- Brass
- Bronze
- Ductile Iron
- Gray Iron
- Malleable Iron
- Steel
Type:
-
Investment
- Sand
- Lost Wax
- Die
Stamping
Machining
Requirements for Quotation
- Manufacturing
Process Desired (I.E.
Forging, Casting, Etc.)
- Drawings and / or
Samples
- Weight of Items
(approximate)
- Type of Material and
Schedule if applicable
- Surface Finishes
- Quantity needed
Procedure
Once we have received
sufficient information, we
will provide a quotation
within a week. If the
quotation is acceptable, We
will have a sample made and
shipped to required
destination. Upon approval
of sample, we will have the
product made and shipped.
The time from acceptance of
quotation until receipt of
sample is usually 2-4 weeks.
The time from approval of
sample until receipt of
production for the first
order is usually 120-150
days.Subsequent orders are
usually 70-100 days. |